{"id":2850,"date":"2022-06-02T09:44:00","date_gmt":"2022-06-02T07:44:00","guid":{"rendered":"https:\/\/saitec-offshore.com\/?p=2850"},"modified":"2022-06-02T18:08:00","modified_gmt":"2022-06-02T16:08:00","slug":"parque-precomercial-medfloat","status":"publish","type":"post","link":"https:\/\/saitec-offshore.com\/en\/parque-precomercial-medfloat\/","title":{"rendered":"Medfloat, pre-commercial pilot park in the Mediterranean Sea"},"content":{"rendered":"\n<p>We want to announce our interest in developing a <strong>pre-commercial pilot park with 5 units and a total potential of 50MW in the Mediterranean Sea in 2025<\/strong>. The offshore wind turbines will use SATH technology in open sea in Girona, specifically in an area located more 15 km from Cap de Creus on the Costa Brava (Catalonia)<\/p>\n\n\n\n<p><strong>Medfloat Pilot Parc<\/strong> has started with the presentation of the Initial Project Document for assessment by the competent environmental body, which will answer with information on the scope that the environmental impact study should have. However, Saitec is already carrying out drafting work on the Environmental Impact Study.<\/p>\n\n\n\n<p>Medfloat Pilot Parc will involve the creation of a test infrastructure in the Levantino-Balearic Demarcation for the testing, demonstration, and validation of SATH technology. It will also demonstrate the technical, environmental and social feasibility of future developments of floating offshore wind energy, and particularly of SATH technology, in the Mediterranean.<\/p>\n\n\n\n<p>At the same time, it aims to become a pioneering project to investigate the possibilities of shared use with other activities, especially with fishing and aquaculture, as well as the promotion of employment and boost the supply chain of offshore wind energy in Catalonia. In addition, the wind turbines will potentially provide power for 50,000 homes.<\/p>\n\n\n\n<p>The selected installation area has been provisionally defined as Priority Use for offshore wind power in the Maritime Spatial Planning Plans of Spanish Government. At the same time, meets the right wind and depth conditions to launch this project.<\/p>\n\n\n\n<p>Medfloat Pilot Parc is an initiative aligned with the climate neutrality objectives and one &nbsp;step forward in consolidating SATH technology, after the development of the pioneering <a href=\"https:\/\/saitec-offshore.com\/projects\/demosath\/\">2 MW DemoSATH project<\/a>, which is currently under construction in the port of Bilbao. The objective of this pilot project, carried out in collaboration with RWE, is to test the technology and progress in the industrialized manufacturing process for this solution.<\/p>\n\n\n\n<p>DemoSATH will be installed in the BiMEP test area (Biscay, Spain), where tests will be carried out for two years, providing useful information for the environmental evaluation of MedFloat. DemoSATH will be the first floating offshore wind turbine connected to the Spanish grid and capable to provide power to 2,000 homes.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We want to announce our interest in developing a pre-commercial pilot park with 5 units and a total<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":2853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-2850","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Medfloat, pre-commercial pilot park in the Mediterranean Sea &#8211; Saitec Offshore Technologies<\/title>\n<meta name=\"description\" content=\"Saitec presenta un nuevo parque piloto precomercial: Medfloat, que constar\u00e1 de 5 unidades y que contar\u00e1 con un potencial total de 50MW el Mar Mediterr\u00e1neo en 2025. El proyecto se situar\u00e1 en mar abierto en Girona, concretamente en una zona situada a m\u00e1s de 15 km del Cap de Creus en la Costa Brava.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/saitec-offshore.com\/en\/parque-precomercial-medfloat\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/\"},\"author\":{\"name\":\"coral\",\"@id\":\"https:\/\/saitec-offshore.com\/#\/schema\/person\/1b1d877adf99255598bf1f96d9b357fd\"},\"headline\":\"Medfloat, pre-commercial pilot park in the Mediterranean Sea\",\"datePublished\":\"2022-06-02T07:44:00+00:00\",\"dateModified\":\"2022-06-02T16:08:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/\"},\"wordCount\":371,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/saitec-offshore.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/\",\"url\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/\",\"name\":\"Medfloat, pre-commercial pilot park in the Mediterranean Sea &#8211; Saitec Offshore Technologies\",\"isPartOf\":{\"@id\":\"https:\/\/saitec-offshore.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png\",\"datePublished\":\"2022-06-02T07:44:00+00:00\",\"dateModified\":\"2022-06-02T16:08:00+00:00\",\"description\":\"Saitec presenta un nuevo parque piloto precomercial: Medfloat, que constar\u00e1 de 5 unidades y que contar\u00e1 con un potencial total de 50MW el Mar Mediterr\u00e1neo en 2025. El proyecto se situar\u00e1 en mar abierto en Girona, concretamente en una zona situada a m\u00e1s de 15 km del Cap de Creus en la Costa Brava.\",\"breadcrumb\":{\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage\",\"url\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png\",\"contentUrl\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png\",\"width\":1024,\"height\":768,\"caption\":\"Parque precomercial Medfloat\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/saitec-offshore.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Medfloat, pre-commercial pilot park in the Mediterranean Sea\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/saitec-offshore.com\/#website\",\"url\":\"https:\/\/saitec-offshore.com\/\",\"name\":\"Saitec Offshore Technologies\",\"description\":\"Concrete floating foundations for a global offshore wind industry\",\"publisher\":{\"@id\":\"https:\/\/saitec-offshore.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/saitec-offshore.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/saitec-offshore.com\/#organization\",\"name\":\"Saitec Offshore\",\"url\":\"https:\/\/saitec-offshore.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/saitec-offshore.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2019\/10\/logo_saitec_offshore.png\",\"contentUrl\":\"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2019\/10\/logo_saitec_offshore.png\",\"width\":600,\"height\":247,\"caption\":\"Saitec Offshore\"},\"image\":{\"@id\":\"https:\/\/saitec-offshore.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/saitecoffshore\",\"https:\/\/www.linkedin.com\/company\/saitec-offshore-technologies\/\",\"https:\/\/www.youtube.com\/channel\/UClhozAPoF-YWSALw9Tp1iJw\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/saitec-offshore.com\/#\/schema\/person\/1b1d877adf99255598bf1f96d9b357fd\",\"name\":\"coral\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Medfloat, pre-commercial pilot park in the Mediterranean Sea &#8211; Saitec Offshore Technologies","description":"Saitec presenta un nuevo parque piloto precomercial: Medfloat, que constar\u00e1 de 5 unidades y que contar\u00e1 con un potencial total de 50MW el Mar Mediterr\u00e1neo en 2025. El proyecto se situar\u00e1 en mar abierto en Girona, concretamente en una zona situada a m\u00e1s de 15 km del Cap de Creus en la Costa Brava.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/saitec-offshore.com\/en\/parque-precomercial-medfloat\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#article","isPartOf":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/"},"author":{"name":"coral","@id":"https:\/\/saitec-offshore.com\/#\/schema\/person\/1b1d877adf99255598bf1f96d9b357fd"},"headline":"Medfloat, pre-commercial pilot park in the Mediterranean Sea","datePublished":"2022-06-02T07:44:00+00:00","dateModified":"2022-06-02T16:08:00+00:00","mainEntityOfPage":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/"},"wordCount":371,"commentCount":0,"publisher":{"@id":"https:\/\/saitec-offshore.com\/#organization"},"image":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage"},"thumbnailUrl":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png","articleSection":["News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/","url":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/","name":"Medfloat, pre-commercial pilot park in the Mediterranean Sea &#8211; Saitec Offshore Technologies","isPartOf":{"@id":"https:\/\/saitec-offshore.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage"},"image":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage"},"thumbnailUrl":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png","datePublished":"2022-06-02T07:44:00+00:00","dateModified":"2022-06-02T16:08:00+00:00","description":"Saitec presenta un nuevo parque piloto precomercial: Medfloat, que constar\u00e1 de 5 unidades y que contar\u00e1 con un potencial total de 50MW el Mar Mediterr\u00e1neo en 2025. El proyecto se situar\u00e1 en mar abierto en Girona, concretamente en una zona situada a m\u00e1s de 15 km del Cap de Creus en la Costa Brava.","breadcrumb":{"@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#primaryimage","url":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png","contentUrl":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2022\/06\/Medfloat-web.png","width":1024,"height":768,"caption":"Parque precomercial Medfloat"},{"@type":"BreadcrumbList","@id":"https:\/\/saitec-offshore.com\/es\/parque-precomercial-medfloat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/saitec-offshore.com\/"},{"@type":"ListItem","position":2,"name":"Medfloat, pre-commercial pilot park in the Mediterranean Sea"}]},{"@type":"WebSite","@id":"https:\/\/saitec-offshore.com\/#website","url":"https:\/\/saitec-offshore.com\/","name":"Saitec Offshore Technologies","description":"Concrete floating foundations for a global offshore wind industry","publisher":{"@id":"https:\/\/saitec-offshore.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/saitec-offshore.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/saitec-offshore.com\/#organization","name":"Saitec Offshore","url":"https:\/\/saitec-offshore.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/saitec-offshore.com\/#\/schema\/logo\/image\/","url":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2019\/10\/logo_saitec_offshore.png","contentUrl":"https:\/\/saitec-offshore.com\/wp-content\/uploads\/2019\/10\/logo_saitec_offshore.png","width":600,"height":247,"caption":"Saitec Offshore"},"image":{"@id":"https:\/\/saitec-offshore.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/saitecoffshore","https:\/\/www.linkedin.com\/company\/saitec-offshore-technologies\/","https:\/\/www.youtube.com\/channel\/UClhozAPoF-YWSALw9Tp1iJw"]},{"@type":"Person","@id":"https:\/\/saitec-offshore.com\/#\/schema\/person\/1b1d877adf99255598bf1f96d9b357fd","name":"coral"}]}},"_links":{"self":[{"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/posts\/2850"}],"collection":[{"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/comments?post=2850"}],"version-history":[{"count":0,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/posts\/2850\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/media\/2853"}],"wp:attachment":[{"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/media?parent=2850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/categories?post=2850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saitec-offshore.com\/en\/wp-json\/wp\/v2\/tags?post=2850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}